Overview
Use the In-Bond Update function to record that in-bond cargo has physically reached the destination facility (FIRMS) or designated arrival port. Arrival completes the transportation leg for IT movements and precedes export for T&E/IE where applicable.
Reminder: Type 61 must be arrived within 30 days; Type 62 must be arrived within 30 days and exported within 15 days after acceptance; Type 63 must be exported within15 days.
Preconditions
- The in-bond must be accepted by ACE (not in reject or pending state).
- You must know the receiving FIRMS code and the arrival date/time.
- Confirm manifest quantity/weight and any splits already processed in transit.
Required Fields
Core
- In-Bond Number
- Arrival Port (usually the destination port on the in-bond)
- FIRMS Code (receiving warehouse/terminal)
- Arrival Date/Time
- Arrived Quantity & Unit of Quantity
- Weight (if required for mode/port)
Optional / Situational
- Container and seal numbers
- Conveyance/trip for the last leg
- Remarks (damage, over/short, split reference)
Steps to Arrive
- Open In-Bond Update.
- Enter the File Number and verify the record. You may also enter NEW to arrive another brokers In-Bond
- Select/confirm the Arrival Port and FIRMS.
- Enter the Arrival Date/Time.
- Enter Arrived Quantity (and weight, if required).
- Review for accuracy and choose Transmit to send the arrival to ACE.
Upon acceptance, the in-bond status updates to Arrived. For T&E/IE, proceed to Export / Close.
Partial Arrivals & Short Shipments
- Partial Arrival: If cargo is split, arrive the quantity received and include remarks noting the balance in-transit. Repeat for subsequent partials.
- Short Shipment: If the quantity is less than manifested, arrive the actual amount and note the discrepancy in remarks for reconciliation.
- Overage: Do not arrive more than manifested—follow port instructions for handling overages.
EDI vs Manual Arrival
- EDI Arrival: For integrated carriers/terminals, arrivals may post automatically to ACE; verify the status in the dashboard before performing a manual arrival.
- Manual Arrival: Use this page to submit the arrival if EDI is not available or failed.
Errors & Exceptions
- Rejects: Correct the field indicated by ACE (e.g., invalid FIRMS, mismatched quantity) and retransmit.
- Wrong Port: If the arrival port differs from the in-bond’s destination, coordinate with the port for reroute/correction.
- Timing: Late arrivals can trigger exceptions—arrive promptly after physical receipt.
Validation & Tips
- Match unit of quantity to the manifest (e.g., CTN, PCS).
- Confirm FIRMS code with the terminal/warehouse.
- Use remarks for split/short shipment traceability.